Skip to content
Wind Turbine Recycling Technologies
Planning

How to Prepare a Blade Inventory for a Recycling Quote

By Wind Turbine Recycling Technologies · Updated 2026-10-16
Awaiting technical review
DraftThis guide is a draft pending technical review. It is not yet indexed by search engines.
In brief

A good inventory records what is known, what is estimated and what is unknown. Measurements and photographs are worth more than assumptions.

Short answer: a quote-ready inventory lists every blade or section with an ID, location, model if known, condition, measured dimensions, mass with its basis, root and metal status, photographs, access conditions and timing. Record unknown values as unknown. A clear inventory shortens the quote process and reduces change orders later.

Inventory template

You can download a CSV version of this template.

---------
Item IDYour own reference, painted or tagged on the pieceAssign one now
LocationSite name, county, GPS point or yard positionApproximate and mark as approximate
Blade model / manufacturerFrom records or nameplateWrite "unknown"; add photos of root and labels
Section typeWhole, root, mid, tip, otherDescribe and photograph
Max cross-sectionWidth and height at the largest pointMeasure
Mass basisMeasured, manufacturer data, or estimate methodState "none"
Metal visibleInserts, bolts, flanges, otherPhotograph
ConditionIntact, cracked, crushed, water/soil contactPhotograph
ContaminationSoil, vegetation, oil, debrisNote what is visible
PhotosFile names—
Access notesGround, gates, turning room—
HandlingCan it be lifted as-is? Who provides equipment?—
ScheduleEarliest and latest dates—

Identifying unknowns without guessing

  • Model: root flange bolt patterns, labels inside the root and manufacturing stamps can help. Photograph them for the reviewer.
  • Mass: do not divide a fleet-wide figure by blade count. If no measured or manufacturer value exists, leave it blank. Weights can be confirmed later on a scale.
  • Construction: a photograph of a cut face shows laminate and core types far better than a description.

Photographs that help

  1. A wide shot of the storage area showing access
  2. Each section type from the side, with a scale reference
  3. Cut faces
  4. Root ends, showing inserts or bolts
  5. Any damage or contamination

Common mistakes

  • Counting blades but not measuring sections
  • Treating three-piece cut blades as already "ready"
  • Mixing estimated and measured weights in one column
  • Omitting access constraints that change equipment selection

Next step

Send the completed inventory with your project review request. Unknown values are fine; the review identifies which ones need to be resolved before a firm quote.

Have blades ready for review? Share the location, quantity and current condition to start a project-specific assessment.